File:Uganda railways assessment 2010-12.jpg

原始檔案 (1,650 × 750 像素,檔案大小:844 KB,MIME 類型:image/jpeg


描述

A serviceable locomotive on the tracks at Jinja rail station, Jinja, Uganda, Sept. 14, 2010.

U.S. Army photo by John Hanson

Railways, the technology that transformed Europe and America in the 19th century, may yet play a significant role in the future economic development of Uganda.

Two U.S. Army logisticians, John Hanson from U.S. Army Africa’s G-4 Programs and Policy Branch, and Lloyd Coakley, from the Military Surface Deployment and Distribution Command’s Transportation Engineering Agency, conducted a four-day assessment of Ugandan railway infrastructure Sept. 13-17 at the request of the Uganda People’s Defense Force’s Engineer Brigade.

The mission was to determine the current operational status of the Uganda railway system and its rolling stock, to assess the capability of UPDF personnel to rehabilitate the network, and to identify potential sites for training and repair operations. USARAF and SDDC were invited to contribute their expertise by Brig. Gen. Timothy Sabiiti, commander of the Uganda People’s Defense Force’s Engineer Brigade, Hanson said.

“He’s been charged with assisting in the rehabilitation of the railways. It would have a very positive economic impact, including natural resource development. It’s a five-year plan, a complete rehabilitation of the railroad. That’s why they’re doing it. It’s all civil development, but the railroad would be used by the military, too. It would enhance their mobility,” Hanson said.

Ugandan assessment team members included Engineer Murungi Daudi, Brig. Gen. George Etyang, Nakaliika Rahmat, Lt. Col. Luke Arikosi, and Engineer Kyamugambi Kasingye. Hanson, Coakley, and their Ugandan hosts, accompanied by a representative of the U.S. Embassy in Kampala, assessed the railroad stations and infrastructure in Jinja, Tororo, Mbale, Kumi, Soroti, Lira and Gulu. They also toured the Nalukolongo Railway Repair Facility in Kampala, he said.

“It’s a significant percentage of the railroad, the majority of the rail lines. We saw almost the entire rail line that has not been completely abandoned,” Hanson said.

The assessment team found the condition of the Ugandan system to vary greatly by region. The railway is still fully functional and operating in the Jinja-Tororo area, Hanson said. Tororo is the easternmost link on the line before it crosses into Kenya, heading for the coast at Mombasa.

As the team progressed north, however, damaged rails were common place, and track along the western section, from Gulu to Pakwach, is in general disrepair, a result of the area being for years under control of the Lord’s Resistance Army.

“It’s been pretty much abandoned since then,” Hanson said.

Nonetheless, the Ugandan-American team could clearly see the potential for future reconstruction.

“The Ugandan government and the UPDF are committed to returning their railway system to a fully operational status. SDDC and USARAF can assist in this effort to help build capacity, not only in Uganda, but eventually throughout the region,” Coakley said.

“It was great to partner with another Army Service Component Command on the continent,” said Hanson. “The engineers from SDDC have a lot of experience and expertise that can assist USARAF in finding solutions to the transportation and mobility issues we face throughout most of Africa.”

The railroads came to East Africa just before the turn of the 20th century, in the hey-day of European colonial expansion, and England and Germany in particular were in competition to build systems to extract the natural resources of what are today Kenya and Uganda. Beginning in the 1890s, both countries undertook mammoth engineering projects to build railroads from the Indian Ocean coast to Lake Victoria in the interior.

The development had profound economic and demographic impacts on the entire region. The influx of workers from British India to build the railways resulted in thriving Indian diaspora communities in both present day Uganda and Kenya; the growth of rail construction centers and nodes stimulated the establishment of such urban centers as Kisumu (then called Port Florence) and Nairobi, both in Kenya.

The Ugandan rail line finally reached Kampala in 1931. The northern branch, beginning in Tororo, was extended to Soroti by 1929 and reached Pakwach only in 1964.

The presently serviceable rolling stock consists of approximately 1,000 wagons and 35 diesel hydraulic locomotives, said Hanson, and though activity has been dormant in some areas for decades, and clearly in need of rehabilitation, the Ugandan system holds great promise for the future.

“SDDC has produced numerous studies on African seaports and infrastructure in the past. USARAF needs to synchronize our efforts with SDDC as they identify future locations to conduct their analyses,” Hanson said.


To learn more about U.S. Army Africa visit our official website at <a href="http://www.usaraf.army.mil" rel="nofollow">www.usaraf.army.mil</a>

Official Twitter Feed: <a href="https://twitter.com/usarmyafrica" rel="nofollow">www.twitter.com/usarmyafrica</a>

Official YouTube video channel: <a href="https://www.youtube.com/usarmyafrica" rel="nofollow">www.youtube.com/usarmyafrica</a>
日期
來源 originally posted to Flickr as Uganda railways assessment 2010
作者 US Army Africa
授權許可
(重用此檔案)
此張圖片原發布於Flickr,在FishInWater管理員審查員Flickr upload bot檢查後,確認檢查時圖片在Flickr的版權聲明與維基共享資源的著作權使用方針相符。
w:zh:共享創意
姓名標示
此檔案採用創用CC 姓名標示 2.0 通用版授權條款。
您可以自由:
  • 分享 – 複製、發佈和傳播本作品
  • 重新修改 – 創作演繹作品
惟需遵照下列條件:
  • 姓名標示 – 您必須指名出正確的製作者,和提供授權條款的連結,以及表示是否有對內容上做出變更。您可以用任何合理的方式來行動,但不得以任何方式表明授權條款是對您許可或是由您所使用。

說明

添加單行說明來描述出檔案所代表的內容

在此檔案描寫的項目

描繪內容

著作權狀態 繁體中文 (已轉換拼寫)

有著作權 繁體中文 (已轉換拼寫)

ISO速度 繁體中文 (已轉換拼寫)

80

曝光時間 繁體中文 (已轉換拼寫)

0.02

9.6 毫米

檔案歷史

點選日期/時間以檢視該時間的檔案版本。

日期/時間縮⁠圖尺寸用戶備⁠註
目前2010年11月11日 (四) 22:46於 2010年11月11日 (四) 22:46 版本的縮圖1,650 × 750(844 KB)Flickr upload botUploaded from http://flickr.com/photo/36281822@N08/5117349907 using Flickr upload bot

下列頁面有用到此檔案:

全域檔案使用狀況

以下其他 wiki 使用了這個檔案:

詮釋資料